Home
Professional Services
Participant Profiles
Concepts / Analysis
Texas Geothermal Energy
Contact & Hot Texas Prospects
Glossary
Visitor Comments


Andrew Reil, Principal / Developer
2429 Bissonnet Street
Suite 315

Houston, Texas 77005
Office: 936.463.6642
Fax: 713.429.4175
Mobile: 713.294.0924
Skype ID: andrew.reil1
Email: 
projectdevelopment@andrewreil.com
 
       


ZAPATA COUNTY - existing hydrocarbon well to be converted to geothermal / NG co-producer; BHT 297 degrees F at 10,350 feet. Estimated conversion capital required: $100,000.00 (one hundred thousand dollars)

State-Of -The Art Geothermal / Geopressure Power Production Facility utilizing down-hole pressure vessel / heat exchangers on 1000 acre South Texas Tract; ALREADY POSITIONED, estimated start up capital $1,500,000.00 (one million five hundred thousand dollars).
POSSIBLE MATCHING DOE GRANT FUNDING OF 1.5 MILLION DOLLARS AFTER START-UP.

Development of Geothermal Real Time Cost Estimate / Scheduling web database to facilitate state wide power source transition - estimated cost $350,000 to one million dollars; Timeframe 3 to 6 months.

EAGLE FORD SHALE GAS PLAY & OTHER EMERGING GAS / OIL - establish and develop 100,000 acre position into the exploration and production phase. Estimated capital expenditure $300,000,000.00 (Three hundred  million dollars).

SOUTH TEXAS COAL BED METHANE Geothermal / Geopressure / Oil - 100,000 acres, 1 Tcf methane gas reservoir above a bituminous coal seam, Oil producing strata above and below in a known geopressure zone, start up capital required; $1,500,000.00 with 3.5 million dollars in escrow. A low risk, long term production, triple tiered prospect. After core sampling,test well expected to prove up at 150 to 300 mcf per day. An ultimate development scenario would be 2500 producing wells over the total acreage. Ultimate development natural gas only estimated capital required: $312,000,000.00(three hundred twelve million dollars)

Top